The cheaper film isn't always the cheaper pack.
A price per kilogram is only one part of what a packaging structure really costs. Waste, rejects, line downtime and shelf-life loss are usually invisible at quotation stage — and they often dwarf the difference in material price. This tool compares the true annual cost of two structures on the numbers your own team already tracks. All figures in AED; sample values shown — replace them with your own.
Your inputs
Both options are compared on this volume. Use the customer’s actual annual off-take for this SKU.
| Metric | A — Current | B — NexaFlex |
|---|---|---|
| Pack material weight g/pack | ||
| Material cost — Ex-Works AED/kg | ||
| Line waste % of material | ||
| Reject rate from packaging % of packs | ||
| Value at risk per rejected pack AED/pack |
+ Export quotation — freight, duty and clearance
| Metric | A | B |
|---|---|---|
| Quote basis Landed includes freight, duty and clearance | ||
| Freight to the customer AED/kg | ||
| Customs duty % of Ex-Works + freight | ||
| Clearance / documentation AED/kg |
+ Add downtime, shelf life, complaints and recall
| Metric | A | B |
|---|---|---|
| Downtime caused by packaging hrs/yr | ||
| Cost per downtime hour AED/hr | ||
| Volume written off on shelf life % of volume | ||
| Value per pack at write-off AED/pack | ||
| Packaging-related complaints count/yr | ||
| Average cost per complaint AED | ||
| Probability of a recall this year % | ||
| Cost if a recall occurs AED/event |
Sample values, shown to illustrate the shape of the comparison. They are not benchmark data — replace every figure with the customer’s own before using this in a business case.
The real comparison
Ex-Works basis, in AED. Freight, duty and clearance are quoted separately.
